CTI has had the privilege of working alongside many of the nation's finest Architects, Engineers, Developers and Contractors. CTI seeks to provide unmatched service on every project undertaken and we take particular pride in our contribution to the following projects:

Chevy Chase Bank Headquarters, Bethesda, MD
A Montgomery County Complex Structures Project
This project consisted of the construction of a twin tower steel frame 15-story above ground office building and 5-story concrete frame below ground parking garage. CTI implemented a complete quality control program covering all structural components of this 750,000 square foot structure.

CTI has been contracted to perform geotechnical and quality control services for an additional 49 Chevy Chase Branch locations.

Client: Chevy Chase Federal Savings Bank - Chevy Chase, MD



Dept. of Transportation Headquarters, Washington, D.C.
CTI is currently providing full inspection services along with an on-site laboratory for this new headquarters building in Washington, D.C. This project is a considerable undertaking with two million square feet of concrete frame office and garage space. It is serviced by eight tower cranes and three on-site concrete batch plants, responsible for producing and placing over 154,000 cubic yards of concrete. The foundation consists of a single mat 5 ½ feet thick, totaling more than 50,000 cubic yards. CTI has provided up to six site personnel simultaneously and has serviced the project on weekends and overnight to meet the demands of the project's aggressive schedule.

CTI is also contracted to provide all D.C. required code inspections for base building and tenant fit-out for MEP, fire protection, construction, and elevators.

Client: The JBG Companies - Chevy Chase, MD


Howard Hughes Medical Institute, Leesburg, VA
CTI has been contracted to provide a complete testing and inspection program for this Rafael Vinoly designed project in Leesburg, VA. The project consists of a 750,000 square foot, four-story cast-in-place concrete structure with post-tensioned and structural steel elements. The unique structure is built with significant underground sections designed to blend in with the site topography. The side of the building contains a 40 ft. high, single-lift poured concrete walls. Earth retention systems include sheeting and shoring, soil nailing and cutback slopes. Site works include extensive utilities, metroplex retaining walls and an extensive network of roads constructed in accordance with VDOT standards. CTI has provided an on-site laboratory to provide efficient testing of soils and the 66,000 cubic yards of concrete batched on-site.

Client: The Mark Winkler Company - Ashburn, VA


National Association of Securities Dealers, Gaithersburg, MD
CTI provided all quality control and geotechnical consulting services during the construction of the NASD Office Building and Parking Garage in Gaithersburg, MD. The structure is a five-story concrete frame post-tensioned office building with an attached cast-in-place parking garage with pre-cast skin. All work was conducted in accordance with Montgomery County Complex Structures requirements.

Client: Boston Properties, Inc. - Washington, D.C.


Westpark Corporate Center Towers, I & II, McLean, VA
A Fairfax County Critical Structures Project
The Westpark Corporate Center Towers project consisted of the construction of two fourteen-story post-tensioned concrete buildings (10-stories of above-ground office space and 4 stories of below-ground parking). CTI inspected all aspects of the project including each of the following: Earth Retention System (Soldier Piles), Post-Tensioning, Soil Fill and Backfill, Concrete, Foundation Bearing, Structural Steel, Reinforcing Steel and Waterproofing. CTI utilized an on-site laboratory to provide all concrete cylinder testing for this facility.

Client: The Mark Winkler Company - Alexandria, VA


Woodrow Wilson Bridge, Main Span & VA Approach, Alexandria, VA
As the largest bridge project currently under construction on the East Coast, the span will carry six northbound and six southbound lanes of traffic on the main North/South Interstate artery of the Eastern seaboard. CTI is providing onsite laboratory testing and quality control services. The work has involved on-land and barge based testing operations performed around the clock to meet the schedule demands of the project. CTI is also providing specialty tests for shrinkage modules of elasticity and creep on lightweight bridge deck concrete.

Clients: American Bridge/Kramer - Alexandria, VA
Virginia Approach Constructors - Alexandria, VA


Global Vision Integration Center, Suffolk, VA
CTI was contracted to provide a comprehensive quality control program for the project. This 55,000+ square foot facility was designed to services both private contractors and federal agencies in development and presentation of classified projects for National Defense.

Though the specific details of construction are confidential, CTI provided a full range of services including Geotechnical Consulting, Materials Testing and Special Inspection services. This rigorous program required up to six inspectors on-site simultaneously.

Client: Lockheed Martin Corporation - Philadelphia, PA


Virginia Commonwealth University - Massey Cancer Center, Richmond, VA
VCU's new cancer center is designed for research and development of cutting edge cancer treatments. CTI was contracted to provide testing and inspection services for this 80,000 square foot structure including geotechnical consulting and inspections for the caisson foundation system, and special inspections for all structural elements including soils, concrete, masonry, structural steel, fireproofing, EIFS, and roofing.

Client: Virginia Commonwealth University - Richmond, VA


Wytheville Community Center, Wytheville, VA
Construction is now underway for this much anticipated new community center in Wythe County, VA. The 14 million dollar project includes four basketball courts, four swimming pools, a gymnastics center, a daycare center and related facilities. CTI is providing a complete Special Inspections Program for the owner. Included in CTI's scope of work is testing and inspection of footings, concrete, reinforcing steel, structural steel, compaction/density testing of fill and backfill, asphalt, water and sewer lines, and roofing.

Client: Town of Wytheville, VA - Wytheville, VA


University of Virginia - John Paul Jones Arena, Charlottesville, VA
Scheduled for completion in June of 2006, the University of Virginia's 129 million dollar project features student and premium seating, practice courts, weight training facilities, offices, lounges, and locker rooms. CTI is providing a complete quality control program for all structural elements including testing and special inspections for foundations, slab on grade and elevated slabs, masonry, reinforcing and structural steel.
www.vmdo.com/special/arena/default.asp

Client: University of Virginia / Barton Mallow - Charlottesville, VA


Great Eastern Resorts - Massanutten Water Park, Massanutten, VA
This 30 million dollar project adjoins Massanutten Resort and features a 42,000 square foot indoor and 88,000 square foot outdoor recreation areas. The pyramid shaped indoor park will operate year round and features a restaurant, 3,500 square foot video arcade, a lounge, and many other family oriented amenities. Outdoor park highlights include a 45 foot tall four lane racing waterslide and a wave pool that can generate one to six foot waves.

Client: Peak Construction Company, Inc. - Massanutten, VA


OrthoVirginia Medical Office Building, Richmond, VA
CTI performed LEED® Fundamental Commissioning for the OrthoVirginia Medical Office Building in Richmond, VA. The two story, approximately 68,000 SF facility includes an indoor therapeutic pool, out-patient orthopedic surgery center, sports medicine and physical therapy services, and general examination rooms. As the Commissioning Authority, CTI completed requirements of LEED® New Construction Energy and Atmosphere Prerequisite 1 "Commissioning of Building Energy Systems" for the HVAC&R equipment and associated controls, lighting controls, and the domestic hot water system. The project received LEED® certification from the USGBC.


Client: Hourigan Construction, Richmond, VA


Army Reserve Center, Fort A.P. Hill, VA
CTI provided enhanced commissioning services for the construction of a new Army Reserve Center at Fort A.P. Hill, Virginia. The center consist of a Training Center, an Organizational Maintenance Shop (OMS), a Storage Building and associated site improvements totaling approximately 39,000 SF in size. As the Commissioning Authority, CTI performed commissioning in accordance with LEED® "Energy and Atmosphere" "Fundamental Building Systems Commissioning" and "Enhanced Commissioning" requirements. Construction of this facility featured energy efficient designs including geothermal Heating, Ventilation and Air Conditioning system, tankless hot water heating and LED interior lighting. This project received Leadership in Energy and Environmental Design GOLD certification by the USGBC.


Client: Charpie-Korte Design-Build J.V. S.B LLC, Chicago, IL


Warriors in Transition Barracks, Fort Eustis, VA
CTI performed LEED® fundamental and enhance commissioning for the Warriors in Transition Barracks at Fort Eustis, Virginia. The project consisted of the construction of a four story barracks building, approximately 48,200 SF in size. As the Commissioning Authority, CTI performed LEED Enhanced Commissioning for the HVAC&R equipment and associated controls, lighting and day lighting controls, and domestic hot water systems. In order to receive this highest level of LEED certification, the building was designed and commissioned with many innovative and energy efficient systems including an onsite grey water recycling system. This project has met all requirements for LEED PLATINUM Certification from the USGBC.


Client: Purcell-Lawman JV, Prince George, VA


WMATA South East Bus Garage, Washington, D.C.
CTI performed commissioning services for the Replacement of the SE Bus Garage in Washington, DC. It included the construction of a new parking structure, as well as new fuel, wash, and maintenance buildings totaling approximately 103,000 SF in size. As the Commissioning Authority, CTI performed commissioning per requirements of LEED® New Construction 2.2. In addition to the HVAC&R equipment and associated controls, lighting controls, and domestic hot water systems required to be commissioned for LEED®, CTI also commissioned the full electrical system, elevator, fire alarm and fire suppression systems as well as specialty systems including a bus wash, fueling system, paint booths, and bus lifts. This project received LEED® SILVER certification by the USGBC.


Client: Hensel Phelps Construction, Chantilly, VA